How to manage projects : (Record no. 94441)

MARC details
000 -LEADER
fixed length control field 01379nam a22002057a 4500
005 - DATE AND TIME OF LATEST TRANSACTION
control field 20240113104843.0
008 - FIXED-LENGTH DATA ELEMENTS--GENERAL INFORMATION
fixed length control field 240113b |||||||| |||| 00| 0 eng d
020 ## - INTERNATIONAL STANDARD BOOK NUMBER
International Standard Book Number 9781398606166
050 ## - LIBRARY OF CONGRESS CALL NUMBER
Classification number HD 69 P75
Item number F5425 2022
100 ## - MAIN ENTRY--PERSONAL NAME
Personal name Fielding, Paul J.
245 ## - TITLE STATEMENT
Title How to manage projects :
Remainder of title essential project management skills to deliver on-time, on-budget results
Statement of responsibility, etc. Paul J. Fielding
264 ## - PRODUCTION, PUBLICATION, DISTRIBUTION, MANUFACTURE, AND COPYRIGHT NOTICE
Place of production, publication, distribution, manufacture London :
Name of producer, publisher, distributor, manufacturer Kogan Page ,
Date of production, publication, distribution, manufacture, or copyright notice 2022.
300 ## - PHYSICAL DESCRIPTION
Extent vii, 218 pages :
Other physical details illustration ;
Dimensions 21 cm.
336 ## - CONTENT TYPE
Source rdacontent
Content type term text
337 ## - MEDIA TYPE
Source rdamedia
Media type term unmediated
338 ## - CARRIER TYPE
Source rdacarrier
Carrier type term volume
504 ## - BIBLIOGRAPHY, ETC. NOTE
Bibliography, etc Includes bibliographical references.
505 ## - FORMATTED CONTENTS NOTE
Formatted contents note Project success is more than just one thing -- The accidental project manager: What is this going to take? Where does a project manager fit in the organization? The role of of the PMO -- Project governance -- Project scope: Defining it, managing it, changing it and avoiding creep -- The project quality plan -- Different types of project lifecycle models -- Planning the project: schedule management (time management) -- The project staffing plan -- Design and configuration management -- Cost planning and cost management -- The project's supply chain plan -- Project execution: tracking, updating, reporting and acceptance -- Evaluation, lesson learnt and improving the next project.
942 ## - ADDED ENTRY ELEMENTS (KOHA)
Source of classification or shelving scheme Library of Congress Classification
Koha item type Books
Call number prefix EAC Cavite-Foreign Section
Holdings
Withdrawn status Lost status Source of classification or shelving scheme Damaged status Not for loan Home library Current library Shelving location Date acquired Cost, normal purchase price Total Checkouts Full call number Barcode Date last seen Date last checked out Copy number Cost, replacement price Price effective from Koha item type
    Library of Congress Classification     EAC Library Cavite EAC Library Cavite EAC Cavite-Foreign Section 11/20/2023 1134.00 2 HD 69 P75 F5425 2022 ML17462 10/13/2026 10/13/2026 c1 1134.00 01/13/2024 Books